Field Documentation

From the
ground up.

Photography and videos from site visits to Chunya District, Tanzania. Raw, unscripted footage of operations, team, and gold production.

Field Footage
Below is a brief highlight video from our most recent site visit, followed by a longer, full-length video from our most recent trip to Chunya District. Footage from our first trip is available under Phase I below.
Quick Summary
The highlights.
In brief.

A short recap of the most recent site visit, capturing the key moments from the trip.

Trip Two · June 2026
Back on site.
Operational kick off.

In June 2026, Archimidas owners Joshua and Cheston visited the site with their partner Akeem to meet with the engineering team and kick off operations. The team also visited existing operations to follow existing successful mining operations.

Phase I ▼
Trip One · January 2026
Tanzania.
On the ground.

In early 2026, Founder and CEO of Archimidas Ltd Joshua Eaton traveled to Tanzania. On this trip Joshua saw first-hand the mining being done in the Chunya Region. While here, the mining concession was acquired, an operations team was formed, and an agreement was made with the Ministry of Mines for mineral rights to the concession.

This documentary shows raw footage of field operations and team member interactions, giving investors a look into our operational plans.

Operations leadership on site
Operations Leadership on Site · Chunya District
Active mine shaft
Planned Open Pit Mining Area
Ore extraction winch
Artisanal Mine Area Two
Artisanal mine shaft
Artisanal Mine Area One
Ore Bearing Rock
Ore Bearing Rock
Second Artisanal Mine Area Inspection
Second Artisanal Mine Area Inspection
Joshua Eaton with operations team
Founder Joshua Eaton with the Chunya Operations Team
First Artisanal Mine Area Inspection
First Artisanal Mine Area Inspection
Processing station
Neighboring Processing Site
Gold separation
Gold Separation Process Underway
Gold recovered
Gold from Wash
Raw gold sample
Raw Gold
Gold smelted on site
Gold Smelt
49.44g gold
49.44g Gold · Archimidas Limited · January 2026
Phase II

October 2026

2 updates
Oct 22

Mine shaft now at a recorded 25 meter depth. Ore and waste removal continues.

▶
▶
▶
Oct 12

Video of ore with visible gold (uncommon), and photos of quality quartz vein being collected.

▶
Quality quartz vein being collected
Quality quartz vein being collected
Quality quartz vein being collected

September 2026

10 updates
Sep 28

Jackhammer purchased, and tailing ponds nearing completion.

▶
Tailing pond wall
▶
Sep 25

Processing zone shelter created.

Processing zone shelter
Processing zone shelter
▶
Sep 20

Processing zone construction underway.

▶
▶
▶
Sep 17

Creation of two more boxes to support mine shaft width.

▶
▶
▶
▶
Sep 12

Bagging and stockpiling ore.

▶
▶
▶
▶
Sep 10

Collection of ore begins.

▶
▶
Quartz vein close-up
Sep 7

Arrived at the depth prior miners stopped at. Quartz vein visible.

▶
▶
▶
Sep 5

Timber reinforcement operation.

▶
▶
Miner at timber pile
Timber support in shaft
Sep 2

Drilling commencing.

▶
▶
Sep 1

Delivery of compressor for drilling.

▶
Compressor delivered on site

August 2026 ▼

8 updates
Aug 31

Akeem with the team, and continued shaft deepening.

▶
Continued shaft deepening
▶
▶
Aug 25

Mud and water separation for continued deepening.

▶
▶
▶
Aug 24

Continued shaft deepening and beginning of ore stockpile.

▶
▶
Ore stockpile
Aug 16

Rigged a winch crossbeam over the shaft entrance to begin hauling waste to the surface as shaft deepens.

Winch crossbeam setup over shaft
▶
Aug 14

Sealed the box cut framing before pushing deeper into the shaft.

Box cut construction
▶
▶
Aug 12

New box cut development.

▶
▶
Box cut development
Box cut development
Aug 5

Continued draining and removal of waste from legacy shaft.

▶
▶
Legacy shaft access
▶
Aug 2

Water drainage and legacy shaft access.

▶
▶
Excavation progress

July 2026 ▼

3 updates
Jul 31

Water pump installed to begin draining the lower excavation zone and preparing for the next stage of the cut.

▶
▶
▶
Jul 24

Processing zone excavation alongside the first supporting infrastructure for the site.

Processing zone excavation
Site infrastructure under construction
▶
Jul 14

Early fieldwork in the alluvial gold area, and excavator work begins on site.

Alluvial gold area
▶